Tuesday, April 16, 2019
Putting It All Together Essay Example for Free
displace It All Together EssayA Childhood to Remember Memorial Splash Park has done for(p) through the early planning stages. It is now clock to take what the committee has composed on paper, and bias it into a reality. The planning stages has taken a number of three months to accurately address timing, sitting/sizing, cost, electromotive force be intimatementding, and residential sphere research for the honey oil. Once those issues were calculated and discussed, then the additional issues of which park elements will be used, security, and attention of the slop park was addressed. The proposal of Memorial Splash Park has been presented to the board, as well as completely research in regards to cost, sitting, sizing, funding options, equipment/labor needed, security, maintenance, and fellowship surveys. The proposal was voted 6 to 1 in elevate of tress of Memorial Splash Park. I, and the committee, have to decide to break ground September 4th, 2012 and complete be nd exactly four months from the date. A brief, but detailed, account will be given as to the move taken over the four months to get the park up and running.Planned Cost of Construction in front construction could begin, total cost had to be calculated for Memorial Splash Park. Once every saying of the planning stage was researched and gathered, C. Faye (assigned committee member to calculating cost) used this equation to the overall cost of switch = Cost of resort sphere equipment + Cost of installation + Cost of surfacing + Cost of design fees, grading, landscaping, and other expenses = essential project cost or budget (Ruth, 2008). This basic equation will help the project quench within budget and the time frame set.Month 1 Underground WorkBefore each park elements could be laid down, the old knowledgeability of the area selected had to be broken up and the universe dug up to view the current pipe and run offage system (see appendix plot 1). It was the dogged that mini mal issues had to be addressed to make the pipe and drainage system adequate to serve the call for of the splash park. What saved a great deal on time was the fact 4 in. polyvinyl chloride pipes (not metal) were in place. Once the minor issues were addressed, the system was tested and inspected it was passed by the citys lead structural engineer. This initial work out took a total of both weeks to complete.Now that the meet pipe/drainage system is in place, foundation has been laid in the respective areas for the full hoops beg and water area. These areas required a picky concrete blend. The playground area foundation will be composed of a shock absorb material that will help make that area safe. To reduce the risk of injury due to falls, playground equipment should be located above a shock-absorbing, or safety surface (Ruth, 2008). It is imperative that children safety be first and foremost. The laying of foundation on each specialized area took two weeks.So the total proc ess correcting pipe/drainage system to laying the foundation was one month. Month 2 resort area Construction Once the foundation has properly dried and been tested, it was decided to start piecing together the playground area (see appendix diagram Playground Area). After much consideration, it was agreed upon going with pressure-treated wood with a insinuate of durable recycled p final stageic over galvanized steel and aluminum. It will give the area a modern however familiar feel. We decided to go with the equipment manufacturers option of a community build. This helped save 25% of the cost of the playground.The community build allowed for the community to come together to erect and assemble the play structure. The manufacturer even provided helper to help organize a successful Build Week, and also trained supervisors to oversee the work. This fictionalization of the playground area took a total of two and a half weeks, and the remainder of the month was left-hand(a) over(p) -hand(a) to rigorous testing of the structure. Month 3 Splash Area Construction, so far, has gone as planned, until a three straight days of rain occurred. This pushed back the start of the splash area (see appendix diagram Splash Area) by a week.This part of the process did not involve the community elaboration and was immaculate by the hired construction crew plus a structural engineer. The elements of the splash park include galvanized steel parts to make the different structures that water will shoot, spray, and pour down. Also, during the laying of the foundation process, holes were make in order to allow for water to shoot up from the ground, allow for the placement of made structures, and to drain the water out. The different colors chosen were to help bring about good vibes and fun times. Once every structure was composed, it was set and mounted in its respective place.The process took four week exactly and passed the structural engineers approval. Month 4 Basketball Cour t Area And Clean Up The construction of the splash area went over by a week due to rain. This left three weeks left until Memorial Splash Park was completed. The last thing was finishing the full court basketball area (see appendix diagram Basketball Court) and cleaning up before the grand opening. The court was left for last because it will take the least union of time to complete. First thing that was done was to surface the court with lights. The surfacing process took no more than three days.Lastly the court was lined and painted and allowed to dry. The basketball court construction was completed in a week and a half. The final week and a half was left to an intense community cleanup, with proper disposal, and reevaluations of each area. Each area was again passed and what could be recycled was indeed. Additional Structures and Services As each area was built, there were also a specified amount of benches, three medium covered picnic areas, grills, and a mile walking circle enc losing the park added. These additional structures will assist in appealing to every one of all ages.The committee left no stone unturned when planning out Memorial Splash Park. Additional services mustiness be provided to keep the park in pristine condition and safe for the patrons. Maintenance will be done quarterly by the Park and Recreation Department for the city. They will be accompanied by a structural engineer to ensure the structures have not been compromised by nature (severe thunder, hail, and rain storms) or defaced. Also the park will be opened from 800am to 1000pm and will have two plain clothed armed security guards on duty during those times.The security guards are there to forfend sexual predators, bullying, gang activity, and fighting. We want everybody to be able to come and have a great time without worrying about anything. Conclusion Memorial Splash Park opened to great reviews seven months after a small committee came together to make a change. A community ba rbeque/splash day was held and everybody was invited. The overall goal was to provide a safe and free place where children and families can enjoy themselves. The construction process was broken down over four months, with each month dedicated to the twist of a specific area.Each structure brought about its own set of challenges, from making sure proper pipe/drainage system was in order to dealing with the elements. The project managed to stay on budget and within the time frame allotted. Memorial Splash Park would not have been the success it is with the involvement of the community. They helped with the building of the playground area as well as the cleanup. Memorial Splash Park was innate(p) out of the need to return fun to the children of the community as well as bring the community together. All it takes is few willing minds to do something bigger than them.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment